Deliverables & Milestones
The covid19 pandemic
TopSpec was initially planned to run from Jan 2019 – Dec 2021. The first reporting period (Jan 2019-Dec 2019) had no major deviations, however, due to the corona outbreak in February 2020, two 6 months extensions of the project were amended.
Updated Gantt chart:
Gantt
Deliverables:
D9.1: Logo and Website launch and public accessibility. – Approved. D9.1
D8.1: IP protection strategy finalized. – Approved.
D9.2: Data management plan. – Approved. D9.2
New version: D9.2_v2
D6.1: Modification of the Orbitrap mass spectrometer. – Approved.
D8.2: Exploitation and Dissemination Plan. – Approved. D8.2
Newest version: D8.2_v3
D9.3: Technical/scientific review meeting documents – Approved
D3.1: Prototype of the HAB gun installed and tested protocol –
Submitted 31/3 – 2020 – Approved
D2.1: In situ testing of the optimized CAD MS/MS protocol –
Submitted 30/6 – 2020 – Approved
D2.2: Protocol of in situ testing of the optimized CAD –
Submitted 28/8 – 2020 – Approved
D5.1: Prototype pI-Trap-ESI installed and tested– protocol –
Submitted 31/8 – 2020 – D5.1 – Approved
D2.3: In situ testing optimized ECD, HECD and EID MS/MS –
Submitted 29/6 – 2021 – Approved
D3.2: Optimized HAB guns installed and tested – protocols –
Submitted 29/6 – 2021 – Approved
D4.1: Protocol- CED gun prototype installed and tested –
Submitted 29/6 – 2021 – Approved
D9.4: Scientific review meeting documents –
Submitted 23/7 – 2021 – Approved
D7.1: Two Prototype FTMS Booster installed and tested-protocol –
Submitted – 1/10 – 2021
D7.2: Top-down analysis software –
Submitted – 30/11 – 2021 –
D4.2: Protocols: CED guns installed and tested –
Submitted – 30/3 -2022
D1.2: Modified Omnitraps with updated software
Submitted – 30/3 -2022 – D1.2
D8.3: Young scientist TopSpec technology workshop –
Submitted – 30/3 -2022 D8.3
D1.1: Two fully equipped Omnitraps & one IMS installed –
Submitted – 31/10 -2022 D1.1
D1.3: Fully serviced, functioning Omnitraps & IMS –
Submitted – 16/11 -2022 D1.3
D6.2: Modified Orbitrap Q Exactive HF X installed –
Submitted – 30/11 -2022 D6.2
D7.3: Optimized FTMS Boosters test protocols –
Submitted – 12/12 -2022
D8.4: Public demonstrations of TopSpec technology
Submitted – 22/12 -2022 D8.4
D8.5: Scientific reports and publications
Submitted – 27/12 -2022 D8.5
New version: 13/1 – 2023 D8.5_v2
D5.2: Two tested, optimized pI-Trap-ESI installed and tested
Submitted – 28/12 -2022 D5.2
D8.6: Exploitation plan and Business strategy document
Submitted – 31/12 -2022
D9.5: Final: Technical/scientific review meeting documents
Submitted – 19/1 – 2023
Milestones:
1. Demonstrated effectiveness of product ion isotopic distribution deconvolution. – Achieved.
2. Omnitraps & IMS Electronics design. – Achieved.
3. Installation of Q Exactive instrument for Omnitrap development. – Achieved.
4. Omnitraps & IMS P.O.s sent to suppliers. – Achieved.
5. Omnitraps & IMS Mechanical design. – Achieved.
6. Data processing algorithms and software for simulated and experimental top-down mass spectra and time-domain data transients – Achieved.
7. Suffic HAB MS/MS demonstrated – Achieved.
8. Interfacing pI-Trap-Orbitrap. – Achieved.
9. Interfacing pI-Trap-Orbitrap OMNI-ORBI combination. – Achieved.
10. Data analysis algorithms and software for simulated and experimental top-down data analysis. – Achieved.
M11. Two FTMS Booster prototypes are designed, implemented, and evaluated – Achieved.
M12. Development of CED MS/MS – Achieved.
M13. All technologies interfaced – Achieved.
Updated by:
Susanna Lundström 2023-02-10