Deliverables & Milestones

The covid19 pandemic

Due to the 2019 novel coronavirus disease (COVID-19) which diminished the work efficiency of all WPs with local shutdowns, reduced workforce presence, sick leaves (e.g., obligatory 14-day quarantine if even slight symptoms are present) we requested and got a 6 months extension of the TopSpec FET OPEN project (829157). Hence, the milestones and deliverables from autumn 2020 and onward have been extended accordingly.

Updated Gantt chart:
Gantt

Deliverables:

D9.1: Logo and Website launch and public accessibility. – Approved. D9.1

D8.1: IP protection strategy finalized.  – Approved.

D9.2: Data management plan. – Approved. D9.2

D6.1: Modification of the Orbitrap mass spectrometer. – Approved.

D8.2: Exploitation and Dissemination Plan. – Approved. D8.2

D9.3: Technical/scientific review meeting documents – Approved

D3.1: Prototype of the HAB gun installed and tested protocol –
Submitted 31/3 – 2020 – Approved

D2.1: In situ testing of the optimized CAD MS/MS protocol –
Submitted 30/6 – 2020 – Approved

D2.2: Protocol of in situ testing of the optimized CAD –
Submitted 28/8 – 2020 – Approved

D5.1: Prototype pI-Trap-ESI installed and tested– protocol –
Submitted 31/8 – 2020 – D5.1.

D2.3: In situ testing optimized ECD, HECD and EID MS/MS –
Submitted 29/6 – 2021 – Approved

D3.2: Optimized HAB guns installed and tested – protocols –
Submitted 29/6 – 2021 – Approved

D4.1: Protocol- CED gun prototype installed and tested –
Submitted 29/6 – 2021 –  Approved

D9.4: Scientific review meeting documents –

Submitted 23/7 – 2021 –  Approved

D7.1: Two Prototype FTMS Booster installed and tested-protocol –
Submitted –  1/10 – 2021

D7.2: Top-down analysis software –

Submitted – 30/11 – 2021 –

D4.2: Protocols: CED guns installed and tested –

Submitted – 30/3 -2022

D1.2: Modified Omnitraps with updated software

Submitted – 30/3 -2022 – D1.2

D8.3: Young scientist TopSpec technology workshop –

Submitted – 30/3 -2022 D8.3

D1.1:  Two fully equipped Omnitraps & one IMS installed –
Submitted – 31/10 -2022 D1.1

Delays:

Optimized FTMS Boosters test protocols

Expexted delivery date – 30/11 – 2022

Milestones:

1. Demonstrated effectiveness of product ion isotopic distribution deconvolution. – Achieved.

2. Omnitraps & IMS Electronics design. – Achieved.

3. Installation of Q Exactive instrument for Omnitrap development. – Achieved.

4. Omnitraps & IMS P.O.s sent to suppliers. – Achieved.

5. Omnitraps & IMS Mechanical design.  – Achieved.

6. Data processing algorithms and software for simulated and experimental top-down mass spectra and time-domain data transients – Achieved.

7. Suffic HAB MS/MS demonstrated – Achieved.

8. Interfacing pI-Trap-Orbitrap. – Achieved.

10. Data analysis algorithms and software for simulated and experimental top-down data analysis. – Achieved.

Updated by:

Susanna Lundström 2022-11-02